A theatre which is planning a “once-in-a-lifetime” £30m revamp has unveiled its new design. Theatr Clwyd in Mold has today released initial designs for the redevelopment of the building, with construction set to begin in 2021. The major project would see the 43-year-old theatre refurbished and repaired in the hope that it will create a “greener, more efficient and sustainable building for the 21st century”.
A public consultation will take place from today until September 23 to allow the public to provide feedback on the plans.
Source: Revealed: Plans for ‘once-in-a-lifetime’ £30m Theatr Clwyd revamp – North Wales Live